Huisman Equipment
Jan 2016 - Sep 2016
Huisman Equipment wants to migrate their SharePoint 2010 intranet platform to SharePoint 2013. The first phase of the migration is a technical upgrade of the platform, site collections will only be visually upgraded if it can be done with minimal effort.
During this project I was responsible for:
- writing the upgrade plan
- designing the SharePoint 2013 farm
- leading the project team
Huisman Equipment wants to migrate their SharePoint 2010 intranet platform to SharePoint 2013. The first phase of the migration is a technical upgrade of the platform, site collections will only be visually upgraded if it can be done with minimal effort.
During this project I was responsible for:
- writing the upgrade plan
- designing the SharePoint 2013 farm
- leading the project team