SharePoint architect / team lead

Huisman Equipment
Jan 2016 - Sep 2016

Huisman Equipment wants to migrate their SharePoint 2010 intranet platform to SharePoint 2013. The first phase of the migration is a technical upgrade of the platform, site collections will only be visually upgraded if it can be done with minimal effort.

During this project I was responsible for:

  • writing the upgrade plan
  • designing the SharePoint 2013 farm
  • leading the project team

 

 

 

 

Huisman Equipment wants to migrate their SharePoint 2010 intranet platform to SharePoint 2013. The first phase of the migration is a technical upgrade of the platform, site collections will only be visually upgraded if it can be done with minimal effort.

During this project I was responsible for:

  • writing the upgrade plan
  • designing the SharePoint 2013 farm
  • leading the project team